This is a sample project with made-up names and numbers. It's read-only, so nothing here is a real person or payment.
Guest bathroom remodel
Dana R. (sample homeowner) · Brightline Tile & Bath (sample contractor)
Budget
$12,400.00Timeline
3 weeksDeposit
FundedHeld by our payment partner until each milestone is approved
Contractor checks
✓ License verified✓ Insurance on file✓ Business bank account verified
The seven steps on this job
- The homeowner posts a job. Guest bathroom remodel · $12,400 budget · 3 weeks.
- A verified contractor is matched. Brightline Tile & Bath: license, insurance and business bank account verified.
- The homeowner funds the deposit. $12,400 is held by our payment partner, not handed over up front.
- Milestones are built. Three milestones, each with a photo checklist and itemized prices.
- The contractor uploads photos. Before and after photos for every checklist item, from the job site.
- AI inspects every photo. Each photo is checked against the agreed scope; issues get a retake request.
- Payment is released the same day. Demolition was approved and paid out the same afternoon.
Milestones
Demolition
Remove old tub surround, tile and vanity; haul away debris.
✓ Old tile removed$900.00
✓ Debris hauled away$900.00
Milestone total$1,800.00
Before

After


Tile & waterproofing
Waterproof membrane, wall tile and floor tile.
✓ Waterproof membrane$1,500.00
○ Wall tile set$3,200.00
○ Floor tile and grout$1,500.00
Milestone total$6,200.00
Before


After


Fixtures & finish
Vanity, toilet, fixtures, paint and final clean.
○ Vanity and sink installed$2,200.00
○ Fixtures and paint$1,600.00
○ Final walkthrough$600.00
Milestone total$4,400.00
Before

After
No after photos
Project total$12,400.00
Paid out so far$1,800.00
Still held$10,600.00
Schedule
Shown as of Sept 15. Brightline sets the dates; Dana proposed moving the final walkthrough to a Friday and Brightline accepted.
Start
Sep 7Target completion
Sep 25Length
19 daysWorking days
Mon–FriMilestone / task
Sep 7Sep 14Sep 21Today
Demolition · Sep 7–Sep 8
Old tile removed · 1d, due Sep 7
Debris hauled away · 1d, due Sep 8
Tile & waterproofing · Sep 9–Sep 18
Waterproof membrane · 3d, due Sep 11
Wall tile set · 3d, due Sep 16
Floor tile and grout · 2d, due Sep 18
Fixtures & finish · Sep 21–Sep 25
Vanity and sink installed · 2d, due Sep 22
Fixtures and paint · 2d, due Sep 24
Final walkthrough · 1d, due Sep 25
Change log (3)
9/11/2026, 9:00:00 AM · Contractor accepted the change to Final walkthrough
9/10/2026, 6:00:00 PM · Homeowner proposed Final walkthrough: start 2026-09-25 (a Friday, so Dana can be home)
9/4/2026, 9:00:00 AM · Contractor set the plan: 3 milestones over 3 weeks, Mon–Fri
Job messages
Dana and Brightline talk in one thread per job. The AI mediator passes messages on, sends routine updates and keeps the record. Either side can switch to talking directly at any time. Sample data.
Guest bathroom remodel
Dana R. (homeowner) · agreed 9/1/2026 (v1.0-2026-10-28)
Brightline Tile & Bath (contractor) · agreed 9/2/2026 (v1.0-2026-10-28)
Brightline Tile & Bath (contractor) · agreed 9/2/2026 (v1.0-2026-10-28)
Homeowner AI-mediated Contractor AI-mediated
All job communication happens in the JobDeposit thread with the AI mediator. The thread is the record for disputes. This is how JobDeposit works, not legal advice.
This thread is for Guest bathroom remodel between Dana R. and Brightline Tile & Bath. I'm the AI mediator: I pass messages on, keep track of milestones, the schedule and receipts, and send routine updates.
Status update: the deposit of $12,400.00 is funded and held. Milestone 1 (Demolition, $1,800.00) can start.
Brightline Tile & Bath says demolition starts Monday at 8 am and asks that the guest bathroom be cleared beforehand.
Dana R. confirms the bathroom will be cleared Sunday evening.
Status update: Demolition photos passed the AI check, so the milestone was released automatically. $1,800.00 was released and paid to Brightline Tile & Bath the same day.
Schedule change: Dana proposed moving the final walkthrough to Friday 2026-09-25. Brightline accepted.
Tile & waterproofing ($6,200.00) photos were submitted and are with a senior reviewer because the AI was less certain about one photo. Nothing is released until review is done.
Sample thread: read-only.